Tonyder

time power

Tonyder Mis à jour   
time power:
the value is estimate the price in the time period, that mean the trimming to increase/decrease the price.
time period:
the calculated period for time power
time shift:
the calculated shift for time power

if the time power is +10% that mean it is the timing to increased the price 10% in the time period.
Notes de version:
change the title
Notes de version:
update the rule
Notes de version:
update the example graph
Notes de version:
reverse the rule
Notes de version:
update the rule
Notes de version:
time power: value is %
remain power: the difference between the price and time power (%)
Notes de version:
add predict price
Notes de version:
fix bug
Notes de version:
remove predict value, since the scale mismatch
Notes de version:
add the difference of predict price
Notes de version:
change the default period to 8 day
Notes de version:
pre update
Notes de version:
Change the algorithm
Notes de version:
update algorithm:

//config
average:
the calculated average value for time power

perdict day:
prediction after day
// output
predict price:
the different price with timepower

remain timepower:
the different price is overflow or underflow with timepower

time power:
time power is +10% that mean it is the timing to increased the price 10% in the peridict day
the increase power means the price increase in the future (peridict day)


+1 is time power after 1 day
+2 is time power after 2 day

// ================================

更新演算法
時間週期
// ================================
設定
平均:
計算時間週期的平均值
預測:
預測天數
// ================================
輸出
預測價格差:
時間週期與目前價格差距
剩餘漲幅:
時間週期與目前價格差距%

時間週期
數值是評估週期內的價格,+10%表示價格可以上漲10%, -10%表示價格可以下跌10%
+1 是明天的數值
+2 是後天的數值

遞增是起漲開始
遞減是起跌開始
Notes de version:
add tiempower +6 ~ +10
change the color +1 ~ +10
Notes de version:
1. add counter, countdown the change day of direction
2. add rate, the day of increase or decrease
Notes de version:
upgrade to version 5
remove the perdict day, it fixed to 10 days now.
Notes de version:
regression, fix the math issue
Notes de version:
fix math issue
Notes de version:
add gain and predict
Notes de version:
change the base value to close
Notes de version:
fix the first day color
Script protégé
Ce script est publié en code source fermé et vous pouvez l'utiliser librement. Vous pouvez le préférer pour l'utiliser sur un graphique. Vous ne pouvez pas visualiser ou modifier son code source.
Clause de non-responsabilité

Les informations et les publications ne sont pas destinées à être, et ne constituent pas, des conseils ou des recommandations en matière de finance, d'investissement, de trading ou d'autres types de conseils fournis ou approuvés par TradingView. Pour en savoir plus, consultez les Conditions d'utilisation.

Vous voulez utiliser ce script sur un graphique ?